LeGrand Engineering Projects

Department of Energy

Department of Defense

Commercial Nuclear

Florida Power Corporation (Crystal River, FL)
Fire Protection Project Manager

  • Fire protection analysis
  • Fire protection engineering reviews for other plant modification projects dealing with penetration seals in fire barriers nd fire protection of safe shutdown components and electrical circuits.

General Services Administration

General Services Administration
(Charleston, SC; Columbia, SC; Florence, SC; Greensboro, NC):

  • Demolition of abandoned fire alarm system and design of re-connection of existing smoke control system to new fire alarm system in the Strom Thurmond Federal Building and Courthouse in Columbia, SC.
  • Demolition of existing fire alarm system and design of new fire alarm system in historic Post Office and Courthouse and the Hollings Judicial Center in Charleston, SC.
  • Demolition of existing fire alarm system and design of new fire alarm system in the Alton Lenon Federal Building in Charleston, SC.
  • Upgrade of fire alarm system for elevator upgrade in federal buildings in Florence, SC and Greensboro, NC.

Center for Disease Control

Centers for Disease Control and Prevention (Atlanta, GA):

  • Fire hazards analysis of various laboratory and office buildings at the Chamblee Campus in Atlanta. Work included field surveys of buildings and analysis of fire hazards, fire protection systems and life safety systems in existing buildings.

U.S. Treasury

U.S. Mint (Philadelphia, PA):

  • Design of new fire alarm and detection system and review of contractor shop drawings.

 

Industrial

Watermark (Greenville, SC):

  • Prepared a study of the fire protection and safety requirements of the curing ovens based on NFPA 86 for the kayak manufacturer. Also, prepared as-built hydraulic calculations and recommended modifications to the sprinkler system to provide adequate protection for the facility.

Screen Tight (Georgetown, SC):

  • Prepared a study of the fire protection requirements of the plastics manufacturing process for the screen door manufacturing process. Process included analysis of protection requirements of PVC and ABS plastics. Specified fire protection requirements of manufacturing and storage buildings, and reviewed contractor shop drawings.

Schools

Anne Arundel County Public Schools (Anne Arundel County, MD):

  • Demolition of existing fire alarm systems for five buildings (four schools and one staff development center); Design of new fire alarm systems and review of contractor shop drawings.

Saint Sophia Greek Orthodox Cathedral (Washington, DC):

  • Design of new sprinkler and fire pump system and new fire alarm system for the 3-story school portion of the campus; Review of contractor shop drawings.